Nov 18, 2019 23:48
4 yrs ago
9 viewers *
English term

surcharge loads

English to Polish Tech/Engineering Construction / Civil Engineering
OSHA’s general trenching and excavation rules are as follows.
• Keep heavy equipment away from the edges of trenches.
• Keep all surcharge loads at least 2 feet back from trench edges.
• Know the location of all underground utilities

Discussion

Darius Saczuk (asker) Nov 21, 2019:
I will.
Paweł Janiszewski Nov 21, 2019:
Wystarczy napisać do ProZ, aby skorygowali. Bo inaczej to będzie ryzyko, że ktoś powieli to na podstawie wybranej odpowiedzi, nie czytając komentarzy itd.
Darius Saczuk (asker) Nov 21, 2019:
@Paweł It looks like I messed up.
Paweł Janiszewski Nov 21, 2019:
A jak się ma wybór odpowiedzi do definicji surcharge load? To jest obciążenie nie tylko od urobku.

"A surcharge load is any load which is imposed upon the surface of the soil close enough to the excavation to cause a lateral pressure to act on the system in addition to the basic earth pressure. Groundwater will also cause an additional pressure, but it is not a surcharge load."

Paweł Janiszewski Nov 19, 2019:
@Mateusz Jak najbardziej.

"A surcharge load is any load such as spoil embankments, streets or highways, construction machinery"
Mateusz Izdebski Nov 19, 2019:
Wydaje mi się że surcharge load to jest obciążenie dodatkowe, a nie naturalne obciążenie powstające przy realizacji wykopu.
geopiet Nov 19, 2019:
obciążenie naziom wykopu ...? Naziom jest to pas gruntu na powierzchni, przylegający do krawędzi wykopu (rys. 6−1). - https://isn.page.link/WAjE - page 85

naziom na rysunkach 6.1, 6.2, 6.3 - pages 83 - 84

------

Ruch pojazdów obciążający naziom wykopu powinien odbywać się poza granicą klina naturalnego odłamu gruntu. - http://pgnieznog.wokiss.pl/zasoby/files/zamowienia_publiczne...

------

Naziom nie obciążony / Naziom obciążony - http://www.ib.pwr.edu.pl/sawicki/trb5.pdf

--------

Proposed translations

1 day 14 hrs
Selected

bciążenie urobkiem

urobektoodspojona warstwa gruntuprzy prowadzeniu wykopów
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "OK. Thank you, IRA100. Thanks to Geopiet."
2 days 6 hrs

obciążenia powierzchniowe gruntu

"A surcharge load is any load such as spoil embankments, streets or highways, construction machinery which is imposed upon the surface of the soil close enough or distance to the excavation. This load causes a lateral pressure to act on the system in addition to the basic earth pressure. One of the most famous methods is Boussinesq strip method"

https://scholarsmine.mst.edu/cgi/viewcontent.cgi?article=245...

"A surcharge load is <b/>any load which is imposed upon the surface of the soil close enough to the excavation to cause a lateral pressure to act on the system in addition to the basic earth pressure. Groundwater will also cause an additional pressure, but it is not a surcharge load.

http://files.engineering.com/download.aspx?folder=aa37078f-6...
Something went wrong...

Reference comments

1 hr
Reference:

Surcharge Load Decisions for the Competent Person

One of the most complicated and least understood requirements of the OSHA Subpart P-Excavations Standard is surcharge loading. There is very little information provided about how to determine and deal with surcharge loads, while there is a lot about requiring the competent person to consider surcharge loads in shoring selection decisions. Here is the requirement from the Excavations Standard:

1926.652(a)(2) Protective systems shall have the capacity to resist without failure all loads that are intended or could reasonably be expected to be applied or transmitted to the system.

Protective system loads come from 3 distinct sources:
1. The soil
2. Water
3. Surcharge loads

A surcharge load is the result of objects on the surface that add loading to the protective system. This applies equally to relief protective systems, (open cut), or support systems (shored).

- https://www.ntsafety.com/2015/06/02/surcharge-load-decisions...

--------

Zabrania się !!!

Przebywania ludzi pomiędzy ścianą wykopu a koparką, nawet w czasie postoju!
Wchodzenia do wykopu i wychodzenia po rozporach oraz przemieszczania osób urządzeniami służącymi do wydobywania urobku!
Poruszania się środków transportu w granicach klina naturalnego odłamu gruntu!
Składowania urobku, materiałów i wyrobów w odległości mniejszej niż 0,6 m od krawędzi wykopu, jeżeli ściany wykopu są obudowane oraz jeżeli obciążenie urobku jest przewidziane w doborze obudowy, w strefie klina naturalnego odłamu gruntu, jeżeli ściany wykopu nie są obudowane!

- http://www.instsani.pl/139/przepisy-bhp-przy-wykonywaniu-rob...

-------

Strefa niebezpieczna jest równa największemu zasięgowi maszyny powiększonemu o 6 m. Poza tym maszyna powinna być ustawiona w odległości co najmniej 0,6 m poza klinem naturalnego odłamu dla danej kategorii (rodzaju) gruntu.

Przy wydobywaniu urobku z wykopu i składowaniu go na odkład należy pamiętać, aby odległość podnóża skarpy odkładu od górnej krawędzi wykopu wynosiła:

nie mniej niż 3 m dla gruntów przepuszczalnych,

nie mniej niż 5 m dla gruntów nieprzepuszczalnych.

Zabronione jest:

Składowanie urobku i materiałów w odległości mniejszej niż 1,0 m od krawędzi wykopu – jeżeli jego ściany są obudowane, a obudowa nie jest obliczona na dodatkowe obciążenia naziomem,

Składowanie urobku i materiałów w granicach klina odłamu gruntu, jeżeli ściany wykopu nie są umocnione.


- https://asystentbhp.pl/bezpieczenstwo-prac-ziemnych-klin-oda...
Peer comments on this reference comment:

agree Frank Szmulowicz, Ph. D.
27 mins
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search