Glossary entry (derived from question below)
Dutch term or phrase:
aanlanding
English translation:
(cable) landfall (point)
Added to glossary by
Michael Beijer
Mar 24, 2015 16:24
9 yrs ago
Dutch term
aanlanding
Dutch to English
Science
Energy / Power Generation
"Aanlanding kabel"
In a table summarising an assessment of the environmental impact of the various parts of an offshore wind farm.
In a table summarising an assessment of the environmental impact of the various parts of an offshore wind farm.
Proposed translations
(English)
3 +4 | (cable) landfall | Michael Beijer |
Change log
Mar 30, 2015 14:26: Michael Beijer Created KOG entry
Proposed translations
+4
8 mins
Dutch term (edited):
aanlanding (kabel); (kabel) aanlanding
Selected
(cable) landfall
See e.g.:
GWIT:
aanlanding [1] = accretion [CIV.ENG.,HYDROL.]
aanlanding [2] (aan land komen, aankomen) = on-shore arrival [SHIP.]
OGL:
aanlanding van een pijpleiding = pipeline landfall
--------------------------------------------------
Note added at 10 mins (2015-03-24 16:35:20 GMT)
--------------------------------------------------
"Cable Landfall and Transition Pits
2.2.23 The onshore cables will interface with the offshore cables at the cable landfall. The proposed cable landfall is within Brooklands Park near East Worthing. The four offshore cables will be terminated onto the four onshore circuits at transition pits. The four offshore cables will be installed underneath the beach and the A259 Brighton Road using horizontal directional drilling (HDD) to bring the subsea cables to the landfall transition pits." (http://www.eonenergy.com/~/media/PDFs/Generation/wind/offsho... )
--------------------------------------------------
Note added at 13 mins (2015-03-24 16:38:11 GMT)
--------------------------------------------------
"Onshore connection cables
At the cable landfall point, the offshore cables will be connected to the onshore underground cables. Between 3 and 6 buried cables will run from this connection point to the onshore substation, a distance of up to 9.3 km. Onshore cables will be buried to approximately 1 m depth. A 5 m wide temporary haul road will be installed alongside the onshore cable route to facilitate cable delivery and installation. This temporary haul road would be removed following completion of the works and the area affected subsequently re-instated."
(Gwynt y Môr Offshore Wind Farm – Environmental Statement – Non Technical Summary November 2005: http://www.rwe.com/web/cms/mediablob/en/1269360/data/1202906... )
GWIT:
aanlanding [1] = accretion [CIV.ENG.,HYDROL.]
aanlanding [2] (aan land komen, aankomen) = on-shore arrival [SHIP.]
OGL:
aanlanding van een pijpleiding = pipeline landfall
--------------------------------------------------
Note added at 10 mins (2015-03-24 16:35:20 GMT)
--------------------------------------------------
"Cable Landfall and Transition Pits
2.2.23 The onshore cables will interface with the offshore cables at the cable landfall. The proposed cable landfall is within Brooklands Park near East Worthing. The four offshore cables will be terminated onto the four onshore circuits at transition pits. The four offshore cables will be installed underneath the beach and the A259 Brighton Road using horizontal directional drilling (HDD) to bring the subsea cables to the landfall transition pits." (http://www.eonenergy.com/~/media/PDFs/Generation/wind/offsho... )
--------------------------------------------------
Note added at 13 mins (2015-03-24 16:38:11 GMT)
--------------------------------------------------
"Onshore connection cables
At the cable landfall point, the offshore cables will be connected to the onshore underground cables. Between 3 and 6 buried cables will run from this connection point to the onshore substation, a distance of up to 9.3 km. Onshore cables will be buried to approximately 1 m depth. A 5 m wide temporary haul road will be installed alongside the onshore cable route to facilitate cable delivery and installation. This temporary haul road would be removed following completion of the works and the area affected subsequently re-instated."
(Gwynt y Môr Offshore Wind Farm – Environmental Statement – Non Technical Summary November 2005: http://www.rwe.com/web/cms/mediablob/en/1269360/data/1202906... )